Periodic review 2013 (PR13)
PR13 established our outputs and funding for Control Period 5 (CP5), and developed an incentives framework for the rail industry
CP5 is the period from 1 April 2014 to 31 March 2019.
This page includes a link to our access charges for CP5, and responses and conclusions for relevant consultations. It also includes our responses to ORR’s PR13 publications.
ATOC presentation – VTAC Reduction Options in CP5 (January 2014)
84 KB
On 29 January 2014, ATOC hosted a workshop on track access charges in CP5, with particular focus on the Variable Usage Charge (VUC).
Closed consultations and conclusions
Full list of closed consultation documents and responses
ORR publications on PR13
Read the ORR publications on PR13